Roofing GuideBy Chad Yates, Owner·Updated September 2026·26 min read
A well-maintained home with a shingle roof and landscaped yard
Quick answer

The NRCA recommends inspecting low-slope roofs at least twice a year, typically spring and fall, plus an extra look after any significant hail, wind or heavy snow event. In Dane County the fall inspection matters most, because it's your last chance to clear drains and fix flashing before freeze-thaw season starts.

Get My Free Estimate →
Since 1979
Family-owned · 47+ yrs
GAF Master Elite
Top-tier certified
Roof provider
★★★★★
24/7 storm line

If you own or manage a building in Middleton, the roof almost never fails all at once. It warns you for a year or two first, usually in ways that are easy to write off: one stained ceiling tile, a drain that gurgles, a gas bill that creeps up every January.

Catching those signals early is the whole ballgame. A flashing detail repaired in September is a few hundred dollars. The same failure found in March, after a winter of freeze-thaw drove water into the insulation and deck, can become a tear-off of that entire section.

Here's what to look for inside and out, how many years you should expect from your system, what repair versus replacement really costs, what to do in the first 24 hours of an active leak, and when a warning sign means "call a roofer" instead of "call an engineer."

Quick reference: what each warning sign usually means

Warning signLikely causeUrgency
Water standing more than 48 hoursClogged drains, sagging insulation, deck deflectionHigh
Ceiling tile staining or drip marksActive leak, often 10-30 ft from the actual breachHigh
Membrane blisters or ridgesTrapped moisture or lost adhesion below the membraneMedium
Cracked, shrunken or pulled flashing at parapets and curbsThermal cycling, failed sealant, poor detail workHigh
Open or fishmouthed seamsAge, movement, weak original welds or adhesiveHigh
Backed-out fasteners, split sealant at standing-seam laps, rust along panel edges (metal low-slope)Thermal movement working screws loose, end-of-life sealant, cut-edge corrosionMedium, High once panels are perforated
Rust on the ceiling grid or on rooftop unit curbsLong-running slow moisture, months or yearsMedium-High
Musty smell in a room with no visible stainWet insulation or wet deck above the ceilingHigh
Heating and cooling bills climbing year over yearWaterlogged insulation has lost R-valueMedium
Granule loss or bare spots on modified bitumenUV degradation, end of service lifeMedium
Sagging deck or springy feel underfootStructural, not just roofingCall before you walk it

The warning signs you can spot from inside the building

Start indoors. It's free, it's safe, and interior clues often show up before anything is obvious from the roof.

Ceiling stains that move. Water runs along the underside of steel deck flutes, along conduit and along joists before it drops. The stain in a Middleton office suite is frequently nowhere near the actual breach, which is why chasing leaks from inside alone rarely works. A good tech maps the interior evidence against the rooftop layout directly above it.

Rust on the ceiling grid, sprinkler hangers or HVAC curbs. Rust means this has been going on a long time. Staining can happen in one storm. Corrosion takes seasons.

A musty, earthy smell with no visible leak. Wet insulation in a roof assembly smells before it stains. In tenant spaces with hard-lid ceilings, smell is sometimes the only warning you get.

Utility bills that keep creeping. Polyiso insulation loses a large share of its thermal value once it's wet, and it does not dry out inside a sealed assembly. If a light-industrial building off Deming Way is harder to heat than it was three winters ago, the roof is a legitimate suspect.

Nail pops, blistering paint or bowed drywall at exterior walls. That's usually a parapet or coping problem, water entering above the wall line rather than through the field of the roof.

A well-maintained home with a sloped roof and siding visible

What to look for on the roof itself

Three things fail most often on low-slope commercial roofs in Dane County: drainage, flashings and seams. Not the field of the membrane. If you only check three things, check those.

Ponding water past 48 hours

Rainwater should be gone in a day or two. Anything still sitting after roughly 48 hours is ponding, and ponding is both a symptom and a cause. It weighs about 5.2 pounds per square foot per inch of depth, it accelerates seam breakdown, and it hides whatever is failing underneath.

Look for dark tide lines, silt rings, algae and sediment trails. Those show you where water sits even on a dry day.

Clogged and undersized drains

On the retail strips and office parks along the University Avenue and Greenway corridor, drains and scuppers fill with cottonwood seed, maple samaras, oak leaves and grit washed off adjacent mansards. One plugged drain turns a healthy roof into a pond. Check strainers every spring and fall, and again after leaf drop.

Membrane and panel problems by type

  • TPO and PVC: split or gapping heat-welded seams, chalky and crazed surfaces, shrinkage pulling at corners, punctures along rooftop unit service paths where techs drop tools.
  • EPDM: check the seam tape, especially at T-joints. Older EPDM fails at seams and pipe boots long before the rubber itself gives out. Shrinkage that pulls flashing tight at the parapet is a classic late-life symptom.
  • Modified bitumen and built-up: granule loss, alligatoring, open laps, blisters that move underfoot, and ridging that follows the insulation joints below.
  • Low-slope metal: screws that have backed out and left the washer standing proud, split sealant in standing-seam laps and endlaps, rust blooming at cut edges and panel ends, and oil-canning that has opened a seam. Metal moves a lot with temperature, and Middleton gives it a 100-degree annual swing to work with.

Flashing at parapets, curbs and penetrations

This is where most leaks actually start. Parapet base flashing, coping joints, HVAC curbs, gas line supports, conduit penetrations, drain bowls and pitch pans all move with temperature. Middleton swings from below zero in January to the 90s in July, and that thermal cycling works sealant loose year after year. Cracked pitch pans and dried-out termination bar caulk are two of the most common findings on a commercial walk-through.

Anything added since the roof went on

New rooftop equipment, solar racking, antennas, even a badly set walkway pad can create a leak or block drainage. Every new penetration is a new failure point unless it was detailed right.

The first 24 hours on an active leak

Protect the interior first, find the breach second. In that order, because water in a tenant's inventory or a server rack costs more than the roof repair will.

What the first day should look like:

  • Contain and extract. Move or cover product, get a wet-vac on standing water, and pull saturated ceiling tile down so it isn't holding a pound of water over someone's head. Wet insulation and wet gypsum board start growing things within a couple of days.
  • Kill the hazard. If water is running near panels, lighting or conduit, get the affected circuits shut off before anyone works under it.
  • Temporary protection up top. A defensible temporary fix is a compatible patch or tarp mechanically secured with battens and fasteners, not a tarp held down with blocks and bricks. Loose tarps become sails, and in a Wisconsin wind they take edge metal with them.
  • Document before you clean up. Dated photos of the interior damage, the roof condition and the temporary repair. That file is what an adjuster and a warranty administrator will ask for later.
  • Ask about billing when you call. Emergency and after-hours work is often priced differently than a scheduled repair. It's a fair question and any honest contractor will answer it on the phone before dispatching.

On response time, be realistic. We keep 24-hour emergency response for active leaks, and during a widespread storm event every commercial roofer in Dane County is triaging by severity, so occupied buildings and life-safety exposures go first. Tell whoever answers the phone what is getting wet. That is what determines where you land in the queue.

When it's a structural engineer's problem, not a roofer's

A roofing contractor should tell you plainly when a problem is out of their lane. Stop and bring in a licensed structural engineer if you see:

  • Visible sag or deflection in the deck, or a springy feel when you walk it
  • Standing water that returns to the same spot after drains are clear and tapered insulation was added
  • Cracked, bowed or leaning parapet walls, or separated masonry at coping joints
  • Interior doors that stick or partitions that crack near mid-bay
  • Snow drift loading against a taller adjacent wall, a real concern on the stepped-height buildings common in suburban office parks

Replacing a membrane over a compromised structure just buries the problem under a new warranty.

How many years should your system have left?

General service-life expectations, assuming the roof was installed correctly and maintained:

  • TPO / PVC: 20-25 years
  • EPDM: 20-30 years, and attachment method drives where you land. Ballasted and fully adhered assemblies tend to reach the upper end. Mechanically fastened EPDM in a freeze-thaw climate often falls short of it, because the fasteners and plates concentrate stress and movement right at the seams.
  • Modified bitumen: 15-20 years
  • Built-up (BUR): 20-30 years
  • Restoration coating: 10-15 years, with a recoat extending it

Treat those as ranges, not promises. Wisconsin shaves years off all of them: freeze-thaw cycling pries open hairline cracks, hail bruises modified bitumen and dents edge metal, and ponding cooks seams from the top down. An unmaintained roof in Dane County tends to age out at the bottom of its range. If yours is past 15 years and has never had a documented inspection, assume you're closer to a decision than the brochure suggests.

If any of this sounds like your building, an on-site look costs you nothing. Call (608) 909-9109 and we'll walk the roof, photograph what we find, and send you a written report you can hand a tenant, a lender or a board.

Repair or replace, and what each costs in this market

Scope and moisture decide it. If failures are isolated to flashings, seams or one bay and the insulation is mostly dry, repair is the right money. A common industry rule of thumb is that once roughly a quarter of the insulation is wet, replacement usually wins, because you're paying to remove and replace that much of the assembly anyway.

The ranges below reflect what low-slope commercial work has been bidding in Dane County recently. Material pricing moves, so treat them as planning numbers, never a quote:

  • Isolated repairs (flashing detail, seam weld, pipe boot, drain reset): roughly $500-$3,500
  • Sectional repair with wet insulation replacement: roughly $3,000-$15,000 depending on square footage
  • Full tear-off and new single-ply system: commonly $9-$16 per square foot installed
  • Restoration coating over a sound, dry membrane: commonly $3-$7 per square foot

What pushes a job toward the top of the range: bad roof access or no interior hoist path, crane or boom time, tall parapets and heavy wall flashing, new tapered insulation to fix drainage, new ANSI/SPRI ES-1 rated edge metal, occupied space requiring after-hours work, and code-driven insulation upgrades on a tear-off.

The math on deferring is not rhetorical. A pitch-pan reseal on an office-park roof is typically a $700-$1,200 line item. Let that same detail run three or four Wisconsin winters and you're replacing saturated insulation and membrane across the surrounding bays, which on a mid-size section lands well into five figures. Same defect, two very different invoices.

If a targeted commercial roof repair buys you another eight years, that's what we'll recommend, in writing.

Coating versus replacement

A silicone or acrylic restoration coating is a smart move on a roof that's weathered but sound and dry underneath. It's cheaper, faster, and it usually keeps tenants entirely undisturbed.

It's the wrong move when insulation is already wet, when seams are failing, or when the existing membrane won't hold adhesion. Coating a wet roof traps the moisture and rots the deck quietly. Get a moisture survey or core cuts first. Always.

One accounting note worth raising with your CPA, not with us: coatings and repairs are often handled as a maintenance or repair expense, while a full replacement is typically capitalized. Current federal rules can also allow Section 179 expensing for roofs on nonresidential buildings in some situations, but the rules and dollar limits change, so confirm current eligibility with your CPA before counting on it. That difference sometimes matters more to the decision than the price tag does.

How owners actually pay for a replacement

Phasing is the first lever. Ask for the bid broken out by roof section with separate pricing. Many buildings, especially multi-tenant retail and older office parks with several roof levels, can be replaced across two fiscal years, worst section first, with a coating holding the line on the sound half.

Beyond phasing, the common capital routes are a bank term loan or line of credit against the property, roofing-specific or manufacturer-affiliated equipment financing (often 5-10 year terms), CAM recovery or an amortized pass-through of the roof cost over the remaining lease term where the lease permits it, and Wisconsin's commercial PACE program, which lets qualifying energy-related building improvements be repaid through a special property assessment. Roof insulation upgrades can sometimes qualify under PACE when they're part of an eligible efficiency scope, but eligibility depends on the program's rules and your lender's consent, so confirm both before you count on it. We'll scope and phase the work either way and put it in writing so you can take real numbers to ownership or a lender.

Will insurance cover it?

Commercial property policies pay for sudden, accidental damage. They don't pay for age. Hail bruising, wind-lifted edge metal, creased membrane, blown-off coping and debris punctures are covered events. Ponding, shrinkage, granule loss, open seams from thermal cycling and deferred maintenance are not, no matter how much water is coming in.

Two things surprise owners. First, many commercial policies include cosmetic-damage exclusions or roof endorsements that pay actual cash value (depreciated) rather than replacement cost on an older roof, and wind/hail deductibles are often a percentage of insured building value instead of a flat number. Read your declarations page before a storm, not after.

Second, the most common lever an adjuster uses to deny a commercial roof claim is missing maintenance documentation. Dated inspection reports with photos are what separate "storm damage" from "this roof was already failing." We handle storm damage assessment and insurance documentation and meet your adjuster on the roof so the same conditions get documented by both sides.

Who pays when a leak ruins a tenant's inventory?

This one comes up constantly in multi-tenant retail, and the short answer is that the building policy and the tenant's policy cover different things. Your property policy covers the building. The tenant's business personal property coverage covers their inventory, fixtures and equipment, and their business income (business interruption) coverage covers lost sales if they have to close.

Most commercial leases require the tenant to carry both and include a waiver of subrogation so the insurers don't chase each other. Where it gets uncomfortable is a leak the owner knew about and didn't fix. Documented notice of a defect plus no action is exactly the fact pattern that turns a tenant's loss into a claim against the landlord. That's another reason to get findings in writing and dated, and to actually close out the repair.

A well-maintained home with a deck and backyard visible

Want a straight answer on your roof?

We'll inspect it, document everything, and tell you honestly what you're looking at, even if the answer is patch it for now. No pressure.

Warranties: types, transferability and what voids them

Material-only warranty: covers the membrane against manufacturing defects. Labor, tear-off and interior damage are on you.

  • Contractor workmanship warranty: covers installation errors for a stated term. Ask every bidder to spell the workmanship term out on the written proposal for the specific system they're quoting, then compare that language side by side. "Workmanship guaranteed" with no term and no covered-defect language is not a warranty.
  • NDL (no dollar limit) manufacturer warranty: covers materials and labor for the covered term with no cap tied to the original contract price. It is only issued when the system is installed by an installer that manufacturer has approved, using their specified components, and verified by a post-installation inspection.

That last point is where bids differ most. A contractor who isn't approved by the manufacturer of the membrane they're quoting cannot get you NDL coverage, period. So the right question on commercial membrane work is narrow and specific: which manufacturer certifies the exact system in this proposal, and can you show the paperwork? Certifications don't cross over between product lines, and a steep-slope credential like GAF Master Elite, which we hold on the residential side, is a shingle-roof qualification, not a single-ply one. Same principle, factory-vetted installer and stronger warranty, but ask per system.

If you sell or refinance

Ask about transferability before you sign, not at closing. Manufacturer NDL warranties are generally transferable to a new owner one time, but almost never automatically. Expect three requirements: written notice to the manufacturer within a set window after the sale (commonly 30-60 days), a transfer fee, and an inspection, with any punch-list repairs completed before the transfer is approved. Miss the window and the remaining coverage can simply die with the sale.

Contractor workmanship warranties vary more. Some transfer, some don't, some transfer only to the first subsequent owner. If a buyer's due diligence or a lender's appraisal is in play, get the transfer moving weeks ahead of closing. It's a paperwork delay, not a quick phone call.

Two things void more warranties than weather: unapproved rooftop work by an HVAC or telecom sub, and skipped maintenance documentation. Keep a file. Manufacturers ask for it when you file a claim.

Permits, recover limits and the insulation upgrade nobody budgets for

Commercial re-roofs in Middleton generally require a building permit through the city's building inspection process, and larger or structural scopes can trigger state plans review. Any legitimate contractor pulls that permit in their name, not yours.

On recovers, the code sets a hard ceiling. The commercial building code Wisconsin adopts generally allows only one recover. If your building already has two roof coverings in place, a full tear-off is required, and a recover is also off the table when the existing roof is water-soaked or deteriorated to the point it can't serve as a base for the new system. So if a bidder quotes a cheap recover over what's already a recover, or over insulation nobody tested for moisture, that's not a value engineering decision. It's a scope that shouldn't pass inspection.

Here's the other cost driver owners don't see coming: Wisconsin's commercial energy code sets minimum R-values for roof insulation, and when you tear off to the deck you're generally expected to bring the assembly up to current requirements. Buildings put up in the 1980s and 90s were insulated well below today's standards, so a tear-off can mean an extra inch or two of polyiso across the whole roof. That's real money, and it's a legitimate reason one bid is higher than another. Ask each bidder whether their number includes the code-required insulation.

Cold-weather work: what can and can't happen in a Wisconsin winter

Temperature, not the calendar, decides this. Some commercial roofing proceeds fine in the cold. Some of it genuinely should not.

Adhesives and primers have minimum application temperatures. Most solvent-based bonding adhesives and asphalt primers are specified for application above roughly 40 degrees, on a substrate at or above that temperature and rising, with cold-weather formulations going somewhat lower. Below spec, adhesive doesn't flash off and bond properly, and you get a roof that looks installed and peels in the first windstorm. That's why fully adhered single-ply and self-adhered modified bitumen usually wait for spring in Dane County.

Mechanically fastened systems can often still go on. Fasteners and plates don't care about air temperature. What matters is a dry, snow-free, frost-free deck and disciplined welding.

Hot-air welding gets harder in the cold. Cold, stiff membrane pulls heat out of the weld, so welders need slower speeds and adjusted heat, and every crew should be running test welds at the start of the day and again when conditions change. Probing seams with a hook is also less reliable when the sheet is rigid. Good crews weld conservatively and reprobe as the day warms.

Winter tear-offs move in smaller bites. You open only what you can dry-in the same day, because a deck left open overnight in January can pick up frost or blowing snow and trap it in the new assembly.

What a defensible temporary winter fix looks like

If your roof starts leaking in January and the permanent scope has to wait, the temporary work should still be real work:

  • Wet insulation pulled out of the immediate leak area rather than covered over
  • A compatible patch or cover strip installed and probed, or a mechanically battened tarp where welding isn't viable in the conditions
  • Terminations fastened, not just caulked, so wind can't get under the edge
  • Written documentation that it's temporary, with the spring scope defined and priced so you can budget for it now

The wrong version is a bucket of wet-patch smeared over snow. It buys a week and complicates the permanent repair.

Winter is when small problems get expensive

Snow melts against a warm roof, runs to a cold edge or a frozen drain, and refreezes. That ice backs water into seams and up under base flashing. Drifting behind parapets and against taller wall sections concentrates load right where the assembly is already weakest. And freeze-thaw cycling, which south-central Wisconsin delivers through much of late fall and early spring, pries open every hairline crack it finds.

Two practical rules: clear drains and scuppers before the first hard freeze, and never let anyone chip snow or ice off a membrane roof with a shovel, spade or pick. Steel on a cold membrane punctures more commercial roofs than the winter weather itself does. If snow has to come off for load reasons, it's a plastic-shovel-and-leave-the-last-inch job, done by someone who knows what's under their feet.

Set an inspection cadence, and read the bids carefully

The NRCA recommends inspecting low-slope roofs at least twice a year plus after any significant storm. That's the standard we work to:

  • Spring: document winter damage, clear drains, check seams and flashings for ice-related splits
  • Fall: clear leaf debris, reseal terminations, verify drainage before freeze-up
  • After a storm: hail bruising on modified bitumen, wind-lifted edge metal, displaced coping, debris punctures

A scheduled commercial roof maintenance program catches details while they're still cheap and builds the paper trail your warranty and any future claim will need.

When you do go out for bids, the low number is usually low for a reason. Watch for: a recover quoted without a moisture survey (or over two existing layers), no unit price for wet insulation replacement, thinner membrane (45 mil where 60 mil was specified), reused edge metal, no tapered insulation on a roof that already ponds, code insulation left out, and no manufacturer approval, which quietly removes the NDL warranty you thought you were buying. Ask for the spec sheet, the warranty type and certificates of insurance from every bidder.

How disruptive is this to your tenants?

Less than most owners fear, if it's sequenced properly. With cooperative weather, tear-off and replacement typically moves a few thousand square feet a day, so a 10,000 sf roof is often 2-4 working days. Plan around:

  • Noise. Mechanically fastened systems mean screw guns and plates over occupied ceilings. It's loud directly below the active area, and it moves with the crew.
  • Odor. Fully adhered systems use bonding adhesives that can pull into rooftop HVAC intakes. We coordinate shutting down or isolating affected units while working near them, and schedule adhesive work after hours or on weekends over sensitive tenants like clinics, daycares and restaurants.
  • Interior protection. Debris gets contained, and anything below open deck areas gets covered.
  • Site logistics. Dumpster and material staging, protected parking stalls, and crane or hoist windows scheduled outside peak customer hours.

Tell us your tenant mix up front and we'll build the schedule around it.

Lease language decides who pays for the roof itself

Read the lease before you spend a dollar. Under a triple net (NNN) lease, tenants frequently carry roof maintenance and routine repairs while capital replacement stays with ownership, and the line between "repair" and "replacement" is exactly where arguments start. Under a modified gross lease, the landlord usually keeps the roof.

Multi-tenant retail adds a wrinkle: one tenant's leak originates on a section of roof serving three suites. A dated report with photos and roof-plan locations settles that faster than anything else. We write ours to be handed straight to a property manager or an adjuster.

A well-maintained brick home with a shingled roof and landscaped yard

Get a straight answer on your roof

We're a family-owned exterior contractor, in business since 1979, working throughout Dane County including Middleton and the surrounding communities. Our commercial roofing division installs and services the low-slope systems named above, TPO, PVC, EPDM, modified bitumen and metal, on office, light-industrial, retail and multi-family buildings. You don't have to take our word on the workmanship: our customer reviews are public on Google, Birdeye, Angi and HomeAdvisor, and our recent projects show the kind of work we hand over. We carry general liability and workers' compensation coverage and will provide certificates before anyone sets foot on your roof.

Here's exactly what the free inspection includes: we schedule around your tenants, walk the roof, photograph every issue, mark it on a roof plan, and email you a written report with repair and replacement options plus honest cost ranges. No charge, and no one sits in your conference room pushing a contract. If the answer is "you've got seven good years left, clean your drains," the report will say that.

What we need from you for the walk-through

  • A way up. A roof hatch with a key, a permanent ladder, or clear ground space for our ladder or a lift. If interior hatch access runs through a tenant suite, let us know so we can coordinate a time.
  • Fall protection handled on our side. Our crews work to OSHA fall-protection requirements at unprotected edges and open hatches. You don't need to provide anything for that.
  • An escort only if your building requires it. Plenty of owners hand over a key and get the report by email. If your property management or a tenant's security policy requires someone with us, tell us when you book so we schedule enough time.
  • A heads-up to tenants if rooftop footsteps will raise questions below.

One note on scope, so there's no surprise: infrared moisture surveys and core cuts are separate, priced services, because they take specialized equipment and they open up the roof. We'll tell you during the walk if we think your roof needs one, and what it costs, before anything gets scheduled.

Call (608) 909-9109 to schedule your free commercial roof inspection, or reach us through our contact page. If you have an active leak, say so when you call. We keep 24-hour emergency response for exactly that.

Get a straight answer on your Madison roof

Wisconsin storm season and insurance non-renewal letters do not wait. Get a free, no-obligation inspection and an honest assessment of exactly what your roof needs, even if the answer is to wait.

Frequently Asked Questions

How often should a commercial roof in Middleton be inspected?
The NRCA recommends inspecting low-slope roofs at least twice a year, typically spring and fall, plus an extra look after any significant hail, wind or heavy snow event. In Dane County the fall inspection matters most, because it's your last chance to clear drains and fix flashing before freeze-thaw season starts.
Can a commercial re-roof happen in a Wisconsin winter, or does it have to wait for spring?
It depends on the system. Mechanically fastened single-ply can often proceed in cold weather with test welds, slower weld speeds and daily seam probing, as long as the deck is dry and snow-free. Fully adhered systems usually wait for spring, because most bonding adhesives and primers are specified for application above roughly 40 degrees and rising. Tear-offs in winter also mean smaller sections opened per day so nothing sits exposed overnight. If your roof is leaking now, the right winter move is usually a documented temporary stabilization with the permanent scope priced and scheduled for spring.
What happens in the first 24 hours of an active leak?
Protect the interior first: move or cover inventory, get a wet-vac on standing water, and contain the drip so it isn't running into electrical or ceiling systems. Then get a crew up to find the entry point and install a temporary patch or tarp, secured with battens rather than just weight. Ask when you call whether after-hours emergency work is billed at a different rate than a scheduled repair, because that varies by contractor and by situation. Photograph everything, dated, before cleanup, since that documentation matters for both insurance and warranty claims.
What does roof access and safety look like for the free inspection?
We need a way up: a roof hatch with a key, a permanent ladder, or clear ground space to set our own ladder or lift. Crews work to OSHA fall-protection requirements near unprotected edges and on any hatch opening. Let us know if a tenant suite has to be entered for interior hatch access, whether anyone from your side needs to escort us, and if tenants should be notified in advance. Most walk-throughs take about an hour on a typical suburban roof.
Will my insurance cover a leaking commercial roof?
Commercial property policies cover sudden, accidental damage: hail bruising, wind-lifted edge metal, creased or torn membrane, debris punctures. They do not cover age, ponding, granule loss, shrinkage or deferred maintenance, and many policies carry cosmetic-damage exclusions or roof endorsements that pay actual cash value instead of replacement cost. Damaged tenant inventory and lost sales are usually covered by the tenant's own business personal property and business income coverage rather than the landlord's building policy. The most common reason a commercial claim gets denied is no maintenance record, so keep dated inspection reports on file.
Can I just coat my commercial roof instead of replacing it?
Sometimes. A coating works when the membrane is basically intact, the insulation below is dry, and the seams and flashings are sound. If moisture is already trapped in the insulation, a coating seals it in and you pay twice. A core cut or infrared moisture scan tells you which situation you're in before you spend anything.
Does a roof warranty transfer if I sell or refinance the building?
Manufacturer NDL warranties are usually transferable once, but not automatically. Most manufacturers require written notice within a set window after closing (often 30-60 days), a transfer fee, and an inspection with any noted repairs completed before the transfer is approved. Contractor workmanship warranties vary and are sometimes not transferable at all, so ask for the terms in writing and start the process weeks before closing.

Get a real number for your project

Cost ranges only get you so far. Tell us your address, what's going on, and the scope you're considering, and we'll get you a clear, honest estimate with no obligation.

Free, no-pressure estimates. We'll walk the project with you and explain every line of the quote before you decide anything.

Family-Owned · Since 1979GAF Master EliteFORTIFIED Provider

Wisconsin Dwelling Contractor · Lic. #DC-080900045

Explore our services
Keep reading
About the author

Written by Chad Yates, Owner, Buckshot General Contracting. Chad grew up in Orfordville, Wisconsin and learned the roofing trade from the ground up, working as a laborer alongside his brothers before founding Buckshot. He and his crew replace and restore roofs across Madison and south-central Wisconsin. Every guide is reviewed for accuracy by our local project crew before it goes live.

Buckshot General Contracting · GAF Master Elite · FORTIFIED Provider · Licensed & insured · 24/7 storm line (608) 909-9109