Roof Replacement Madison WI | Free Estimate, GAF Master Elite
Madison · Dane County, WI

Madison's Local Roof Replacement Crew

Family-owned in Madison since 1979, replacing roofs across Dane County, from Middleton to Sun Prairie to Verona. Local crews who know our winters, GAF Master Elite quality, and a 50-year System Plus warranty. Free on-site estimate.

★★★★★ 4.9 / 5 · 80 Google reviews · GAF Master Elite (top 2% of US roofers)
GAF Master Elite 50-year warranty Most homes in 1 day Free inspection

Free Replacement Quote

Madison & surrounding areas · We respond in 2 hours
We cover your area.
No spam. No obligation. Just an honest quote.
or call directly (608) 909-9109

Got it. We'll be in touch.

We received your replacement request and respond within 2 hours during business hours. For an active leak, call (608) 909-9109.

4.9
Google · 80 reviews
<2%
GAF Master Elite
$0
Inspection cost
47yrs
In business since 1979
Replace or repair

First, Do You Even Need a Replacement?

SEC 01 / 08

This is where most Madison homeowners start, and the honest answer saves you money either way. We tell people to repair when that is the right call. Here is how to tell.

Replace

These signs point to a full new roof

  • Roof is 18+ years old, repeated repairs cost more than replacement in this climate.
  • Heavy granule loss in the gutters.
  • Sagging or spongy decking.
  • Two shingle layers already installed (code caps roofs at two).
  • Damage across multiple roof facets from hail or wind.
  • Rising energy bills from a roof that no longer ventilates properly.
Repair

These situations don't need a full replacement

  • Roof is under 12 years old and damage is limited to one section.
  • A single shingle or small patch blew off and the rest is sound.
  • Flashing failure at one chimney, skylight, or pipe boot.
  • A leak traced to a single penetration that can be sealed.
  • Ice dam damage at one eave that targeted repair can solve.
How Buckshot replaces a roof

7 Steps From First Call to Finished Roof

SEC 02 / 08
1

Free inspection & written findings

We photograph every facet, shingles, decking from the attic, flashing, gutters, and ventilation, and give you a written summary before we discuss price.

2

Line-item estimate

Every cost broken out: tear-off, disposal, decking, ice and water shield, underlayment, shingle, ridge cap, flashing, and permit. Nothing added on install day.

3

Material & color consult

Physical GAF samples at your home. We explain the warranty difference between tiers and show how colors read in real Midwest light.

4

Permit pulled, every job

We pull every required permit before scheduling. WI License DC-080900045. Skipping permits voids insurance and creates resale liability.

5

Install day, one day

Crew arrives 7 to 8 AM, perimeter tarped. Full tear-off, board-by-board decking check, ice and water shield, underlayment, GAF shingles, ridge vent included.

6

Same-day cleanup

All debris hauled out in our truck. Magnetic nail sweepers make two full passes, and we walk the property with you before we leave.

7

Inspection & warranty

The building inspector signs off. We register your GAF System Plus warranty and hand you the full documentation package the same day.

Decking inspection before shingle installation by Buckshot in Madison, WI

We replace what's under the shingles too.

After tear-off, every decking board is inspected and any rotted section is replaced and photographed before new material goes down. Ice and water shield goes on beyond code minimum, at all eaves, every valley, and around every chimney, skylight, and pipe boot.

Real numbers

What a Madison Replacement Costs

SEC 03 / 08

Real ranges by home size, not the "it depends" non-answer. If your home falls outside these, we tell you why during your free estimate.

Home typeSizeTypical rangeNotes
Small ranch / bungalow1,000–1,400 sq ft$7,500 to $11,000Single-layer tear-off, standard pitch, GAF Timberline HDZ
Mid-size colonial / split1,400–2,000 sq ft$11,000 to $15,500Most common size, one-day completion typical
Large two-story2,000–2,800 sq ft$15,500 to $22,000Complex rooflines, multiple valleys, or premium shingle
Large / complex / steep2,800+ sq ft$22,000 to $35,000+Multiple dormers, steep slope, designer or metal options
Roofing squaresPitchExisting layersDecking conditionShingle tierFlashing replacements

Insurance-funded replacement? If a homeowner's claim is covering it, you pay only your deductible, typically $1,000 to $2,500 in Wisconsin, and Buckshot bills your insurer directly for the full replacement cost. All ranges reflect GAF architectural shingles, full tear-off, regional labor, and permit fees. Metal roofing runs 2 to 3x asphalt pricing.

Materials we install

Which Shingle Is Right for Your Replacement?

SEC 04 / 08
Best seller

GAF Timberline HDZ

The benchmark architectural shingle.

  • Up to 130 mph wind resistance
  • StainGuard Plus algae resistance
  • 50-yr System Plus eligible
  • Best for most homes
Premium

GAF Timberline UHDZ

Deeper shadow lines, richer color.

  • Ultra high-def shadow depth
  • All HDZ warranties & ratings
  • About 15 to 20% over HDZ
  • Best for higher-value homes
Designer

GAF Camelot II

Cedar-shake look, no maintenance.

  • 30% heavier, impact resistant
  • Distinctive on character homes
  • Strong hail performance
  • Best for premium curb appeal
Long-term

Metal Roofing

Standing seam steel & Galvalume.

  • 40 to 70 year lifespan
  • Naturally sheds snow & ice
  • Reduces ice dams
  • Best for long-term owners
Insurance-funded replacement

Most Hail Claims Cover Full Replacement

SEC 05 / 08

We photograph every hail impact, measure hit density, and prepare a formal report formatted for insurance, then attend the adjuster meeting and present our findings. Adjusters miss damage on a single walk-through, a documented contractor on the roof changes the conversation. You pay only your deductible, we bill your insurer for the rest.

Real claim, Sun Prairie, WI
$4,200
$22,000

An initial ACV settlement of $4,200 for repairs was reopened after Buckshot attended the re-inspection with full photo documentation, and settled at $22,000 for a complete replacement, covered minus the deductible.

Contractor ConnectionNexusInnovationSedgwickMSP
Start a claim assessment
Warranty

The Strongest Warranty in Residential Roofing

SEC 06 / 08

Most warranties sound impressive until you read the fine print. Here is what GAF Master Elite unlocks versus what a standard contractor can offer.

WarrantyCoversTermProratedTransferable
GAF System Plus (Master Elite)Shingles + workmanship + weather (full system)50 yrNoYes, once
Buckshot WorkmanshipLabor & installation defects10 yrNoNo
GAF Standard ShingleShingles only, no workmanship30 yrYesLimited
Competitor averageVaries, often vague, often not in writing5–10 yrOftenRarely

The 50-year System Plus warranty is non-prorated: a covered failure in year 40 pays the same as year 1, and it transfers to one future owner, which adds documented value at resale.

Why Buckshot

What Actually Differentiates Us

SEC 07 / 08
01

GAF Master Elite

Fewer than 2% of US contractors qualify. It is the only path to the 50-year System Plus warranty, no other certification unlocks it.

02

Zero subcontractors

Every crew member is a Buckshot employee. The person who estimates your roof is in contact with the foreman who installs it.

03

47 years in this climate

We know what freeze-thaw does to decking from below and the ice-dam patterns specific to the Midwest. That informs every decking decision.

04

Full permit compliance

We pull every required permit on every job, documented. WI License DC-080900045. Skipping them puts the legal and insurance risk on you.

05

Most homes in one day

We staff replacement crews to finish most homes from arrival to cleanup in a single day. You sleep under a new roof the night we start.

06

5 insurance carrier programs

Contractor Connection, Nexus, Innovation, Sedgwick, and MSP. Pre-approval and our documentation are a real advantage in claim outcomes.

What homeowners say

4.9 Stars Across 80 Verified Reviews

SEC 08 / 08
★★★★★
"We had a major hail storm. They replaced our roof, gutters, and all of our siding and our house looks brand new."
EY
Erika Young
Wisconsin · Google
★★★★★
"They helped coordinate the whole process with my insurance. Courteous, efficient, and cleaned up everything. Well done Buckshot."
AS
AJ Sosaiii
Wisconsin · Google
★★★★★
"You could not even tell they had been there, except that I had a new roof. I didn't even find a nail."
RM
Rusty McLain
Wisconsin · Google
Recent work

Madison-Area Roofs We've Replaced

FAQ

Questions Before You Decide

Ready for a quote?

Free inspection, written line-item estimate. Mon to Sat, 8AM to 5PM, emergency 24/7.

Call (608) 909-9109
Q.01 How much does a roof replacement cost in Madison?+
Most residential replacements run $8,000 to $18,000 depending on home size, pitch, existing layers, and material. A typical 1,800 sq ft home with GAF Timberline HDZ runs $11,000 to $15,000. We provide free written estimates with full line-item detail, call (608) 909-9109 or use the form for a same-day response.
Q.02 How long does a replacement take?+
Most homes are done in a single day. The crew arrives 7 to 8 AM and completes tear-off, installation, and full cleanup by late afternoon. Larger or steep, complex roofs may take two days. You will have a clear timeline before we start.
Q.03 Do I need a permit?+
Yes, most municipalities require a building permit for a full replacement. Buckshot pulls all required permits on every job. An unpermitted replacement can void your homeowner's insurance, create resale problems, and expose you to liability. WI License DC-080900045.
Q.04 Should I replace or repair?+
Repair makes sense if the roof is under 15 years old and damage is isolated. Replace when it is 18+ years old, shows widespread granule loss, has multiple failing areas, has two layers already, or has hail or wind damage across multiple facets. We give you an honest answer at the free inspection, we tell people to repair when that is right.
Q.05 Can I replace my roof in winter?+
Yes, with conditions. Asphalt shingles need temperatures above roughly 40°F to seal, so we schedule winter work on appropriate weather windows and use cold-weather procedures including hand-sealing. Emergency replacements happen regardless of temperature. Spring through fall is ideal, but we work year-round.
Q.06 Do you replace the decking?+
We inspect every decking board after tear-off and replace any rotted or water-damaged sections, photographed before new material goes down. Sound decking stays, bad boards are replaced at a per-board rate quoted up front so there are no install-day surprises.
Q.07 Does Buckshot work with my insurance?+
Yes, fully. We attend the adjuster inspection, prepare complete damage documentation, and coordinate directly with your insurer. We are pre-approved through five carrier programs: Contractor Connection, Nexus, Innovation, Sedgwick, and MSP. Most storm customers pay only their deductible.

Ready for a Roof That's Done Right?

Free inspection, written line-item estimate, GAF Master Elite installation, and a 50-year warranty. Most homes finished in a day. Family-owned since 1979.

Buckshot General Contracting · 621 N Sherman Ave, Suite B5, Madison, WI 53704 · (608) 909-9109 · WI License DC-080900045 · GAF Master Elite, FORTIFIED, BBB A+ · Mon to Sat 8AM to 5PM, emergency 24/7

Pricing ranges are typical estimates for the Madison area and are not a quote; your written estimate follows a free on-site measurement. Warranty terms are provided in writing with your estimate. Insurance coverage and outcomes vary by policy and carrier; the Sun Prairie claim describes one past result and is not a guarantee.

Free Quote(608) 909-9109
noscript>